
6-22
G30 Generator Protection System
GE Multilin
6.3 METERING
6 ACTUAL VALUES
6
(EQ 6.3)
The harmonics are a percentage of the fundamental signal obtained as a ratio of harmonic amplitude to fundamental ampli-
tude multiplied by 100%. The total harmonic distortion (THD) is the ratio of the total harmonic content to the fundamental:
(EQ 6.4)
Voltage harmonics are calculated only for Wye connected phase VTs. Ensure the
SYSTEM SETUP
AC INPUTS
VOLTAGE BANK F5
PHASE VT XX CONNECTION
setting is “Wye” to enable voltage harmonics metering.
6.3.4 SYNCHROCHECK
PATH: ACTUAL VALUES
METERING
SYNCHROCHECK
SYNCHROCHECK 1(4)
If a synchrocheck function setting is "Disabled", the corresponding actual values menu item is not displayed.
6.3.5 TRACKING FREQUENCY
PATH: ACTUAL VALUES
METERING
TRACKING FREQUENCY
The tracking frequency is displayed here. The frequency is tracked based on the selection of the reference source with the
FREQUENCY AND PHASE REFERENCE
setting in the
SETTINGS
SYSTEM SETUP
POWER SYSTEM
menu. See the
Power
System
section of chapter 5 for details.
6.3.6 FREQUENCY RATE OF CHANGE
PATH: ACTUAL VALUES
METERING
FREQUENCY RATE OF CHANGE
The metered frequency rate of change for the frequency rate of change elements is shown here.
SYNCHROCHECK 1
SYNCHROCHECK 1 DELTA
VOLT: 0.000
V
MESSAGE
SYNCHROCHECK 1 DELTA
PHASE: 0.0°
MESSAGE
SYNCHROCHECK 1 DELTA
FREQ: 0.00
Hz
TRACKING FREQUENCY
TRACKING FREQUENCY:
60.00 Hz
FREQUENCY RATE
OF CHANGE
FREQUENCY RATE OF
CHANGE 1: 0.00 Hz/s
MESSAGE
FREQUENCY RATE OF
CHANGE 2: 0.00 Hz/s
MESSAGE
FREQUENCY RATE OF
CHANGE 3: 0.00 Hz/s
MESSAGE
FREQUENCY RATE OF
CHANGE 4: 0.00 Hz/s
F
real
m h
,
(
)
2
N
----
f m k
–
(
)
h
ω
0
t k
( )
⋅
⋅
(
)
cos
⋅
(
)
k
=
F
imag
m h
,
(
)
2
N
----
f m k
–
(
)
h
ω
0
t k
( )
⋅
⋅
(
)
sin
⋅
(
)
k
=
F
ampl
m h
,
(
)
F
real
m h
,
(
)
2
F
imag
m h
,
(
)
2
+
=
THD
F
2
2
F
3
2
…
F
25
2
+
+
+
=
NOTE
Summary of Contents for G30
Page 10: ...x G30 Generator Protection System GE Multilin TABLE OF CONTENTS ...
Page 30: ...1 20 G30 Generator Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Page 414: ...5 274 G30 Generator Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 484: ...11 12 G30 Generator Protection System GE Multilin 11 6 DISPOSAL 11 MAINTENANCE 11 ...
Page 512: ...A 28 G30 Generator Protection System GE Multilin A 1 PARAMETER LISTS APPENDIX A A ...
Page 620: ...B 108 G30 Generator Protection System GE Multilin B 4 MEMORY MAPPING APPENDIX B B ...
Page 666: ...E 10 G30 Generator Protection System GE Multilin E 1 IEC 60870 5 104 APPENDIX E E ...
Page 678: ...F 12 G30 Generator Protection System GE Multilin F 2 DNP POINT LISTS APPENDIX F F ...