The two sources are configured as follows:
The GSU is again lagging by –30° (from the line side to the generator side). Loss of excitation and reverse power will be
assigned to source 1. In this case, the only phase shift that must be accounted for is the phase shift of the transformer.
Winding 2 is therefore shifted by –30°.
Summary of Contents for G30
Page 10: ...x G30 Generator Protection System GE Multilin TABLE OF CONTENTS ...
Page 30: ...1 20 G30 Generator Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Page 414: ...5 274 G30 Generator Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 484: ...11 12 G30 Generator Protection System GE Multilin 11 6 DISPOSAL 11 MAINTENANCE 11 ...
Page 512: ...A 28 G30 Generator Protection System GE Multilin A 1 PARAMETER LISTS APPENDIX A A ...
Page 620: ...B 108 G30 Generator Protection System GE Multilin B 4 MEMORY MAPPING APPENDIX B B ...
Page 666: ...E 10 G30 Generator Protection System GE Multilin E 1 IEC 60870 5 104 APPENDIX E E ...
Page 678: ...F 12 G30 Generator Protection System GE Multilin F 2 DNP POINT LISTS APPENDIX F F ...