19
08/24/2016
6. Edition, ID No.: 37020GB-F
Operating Manual ERESCO MF4 Type Series
Copyright by GE Sensing & Inspection Technologies GmbH Bogenstrasse 41 D - 22926 Ahrensburg
2.2.4
Ready for operation and warm-up
CAUTION:
Prior to switching on the radiation, insert the optional lead sealing plug
into the tube window, and observe the radiation protection measures
described in section 1.2 Radiation Protection Information!
If a lead sealing plug is not available, the radiation protection information
in section 1.2 must be observed.
Turn the key-operated switch at the operation module from STAND-BY
to
ON
.
The unit is now ready for operation.
Depending on the last operated tube voltage and the expired operation break, the following
masks appear on the display.
If the last operated tube voltage is less than half the nominal tube voltage:
If the last operated tube voltage is greater than half the nominal tube voltage:
The operator is provided with the last operated
tube voltage in the
Warm-up voltage
field.
The operator can accept the provided tube voltage or enter a test voltage up to the maximum
level intended for the day of operation.
Press the
F3 / Warm-up voltage key, enter the desired warm-up voltage in the Warm-up
voltage
field and then press the OK
key.
Subsequently press the
key or the
OK
key: