The “Protection mode” can be disabled by setting par. SP-26
Trip Delay at Drive Fault
to zero which means that the drive will trip immediately if one of the hardware
limits is exceeded.
The DC link capacitors remain charged after power has been disconnected. To avoid electrical shock hazard, disconnect the frequency con-
verter from mains before carrying out maintenance. When using a PM-motor, make sure it is disconnected. Before doing service on the
frequency converter wait at least the amount of time indicated below:
Voltage
Power
Waiting Time
380 - 480 V
0.25 - 7.5 kW
4 minutes
11 - 75 kW
15 minutes
90 - 200 kW
20 minutes
250 - 800 kW
40 minutes
525 - 690 V
11-75 kW (unit size 2x and 3x)
15 minutes
37 - 315 kW (unit size 4x)
20 minutes
355 - 1000 kW
30 minutes
2.2.1 Disposal Instruction
Equipment containing electrical components may not be disposed of together with domestic waste.
It must be separately collected with electrical and electronic waste according to local and currently
valid legislation.
AF-650 GP
Design Guide
Software version: 1.xx
This Design Guide can be used for all AF-650 GP frequency converters with software version 1.xx.
The software version number can be seen from par. ID-43
Software Version
.
2.4.1 CE Conformity and Labelling
What is CE Conformity and Labelling?
The purpose of CE labelling is to avoid technical trade obstacles within EFTA and the EU. The EU has introduced the CE label as a simple way of showing whether
a product complies with the relevant EU directives. The CE label says nothing about the specifications or quality of the product. Frequency converters are regulated
by three EU directives:
The machinery directive (98/37/EEC)
All machines with critical moving parts are covered by the machinery directive of January 1, 1995. Since a frequency converter is largely electrical, it does not fall
under the machinery directive. However, if a frequency converter is supplied for use in a machine, we provide information on safety aspects relating to the
frequency converter. We do this by means of a manufacturer's declaration.
The low-voltage directive (73/23/EEC)
Frequency converters must be CE labelled in accordance with the low-voltage directive of January 1, 1997. The directive applies to all electrical equipment and
appliances used in the 50 - 1000 V AC and the 75 - 1500 V DC voltage ranges. GE CE-labels in accordance with the directive and issues a declaration of conformity
upon request.
The EMC directive (89/336/EEC)
EMC is short for electromagnetic compatibility. The presence of electromagnetic compatibility means that the mutual interference between different components/
appliances does not affect the way the appliances work.
The EMC directive came into effect January 1, 1996. GE CE-labels in accordance with the directive and issues a declaration of conformity upon request. To carry
out EMC-correct installation, see the instructions in this Design Guide. In addition, we specify which standards our products comply with. We offer the filters
presented in the specifications and provide other types of assistance to ensure the optimum EMC result.
AF-650 GP Design Guide
12
2
Summary of Contents for AF-650 GP Series
Page 5: ...AF 650 GP Design Guide 4 1...
Page 53: ...AF 650 GP Design Guide 52 4...
Page 97: ...Please note airflow directions 6 1 5 Mechanical Dimensions AF 650 GP Design Guide 96 6...
Page 98: ...Please note airflow directions AF 650 GP Design Guide 97 6...
Page 99: ...Please note airflow directions AF 650 GP Design Guide 98 6...
Page 100: ...Please note airflow directions AF 650 GP Design Guide 99 6...
Page 173: ...Max cable length 150 m AF 650 GP Design Guide 172 9...
Page 179: ...AF 650 GP Design Guide 178 9...