
Page 5 - 2
Operations
F 60 H Operation and Maintenance Manual
© April 2001 General Binding Corporation
5.1 Power On/ Off
Power on
a) Ensure the laminator is plugged in and that all E-
STOPs are in the unlatched position.
1
/4
tu
rn
b) Turn the MAIN POWER to the up position.
POWER
On
Off
c) Press RESET located above the main power
on/off.
POWER
Reset
d) Power indicator on the control panel should be
illuminated at this time.
2
4
7
9
00
Power indicator light
Power off
a) Ensure the rollers are in the up position.
b) Turn the MAIN POWER to the down position.
POWER
On
Off