![background image](http://html1.mh-extra.com/html/gbc/advancedpunch/advancedpunch_technical-and-service-manual_571056083.webp)
Repair and Adjustment Procedures
Advanced Punch Service Manual
© Copyright 2009 GBC. All rights reserved.
4-25
Figure 4.25 Installing J2 Shaft.
8. Close the Flipper Latch.
Repeat the test of rotating the pulleys to ensure smooth rotation of the Idler
Rollers.
9. Attach the Shaft Spring.
10. Install the front E-Ring to secure.
INSTALL J2 SHAFT
ASSEMBLE BACK
Summary of Contents for AdvancedPunch
Page 1: ...Document 7712571 Rev C1 23 08 2013 AdvancedPunch Technical Service Manual ...
Page 143: ...Section 5 5 4 Copyright 2009 GBC All rights reserved Advanced Punch Service Manual ...
Page 144: ...Parts List Advanced Punch Service Manual Copyright 2009 GBC All rights reserved 5 5 ...
Page 149: ...Section 5 5 10 Copyright 2009 GBC All rights reserved Advanced Punch Service Manual ...
Page 150: ...Parts List Advanced Punch Service Manual Copyright 2009 GBC All rights reserved 5 11 ...
Page 199: ...Section 8 8 4 Copyright 2009 GBC All rights reserved Advanced Punch Service Manual 2 1 ...
Page 201: ...Section 8 8 6 Copyright 2009 GBC All rights reserved Advanced Punch Service Manual 2 1 2 1 2x ...