Maintenance
Advanced Punch Service Manual
© Copyright 2009 GBC. All rights reserved.
1-7
1.3.3 Die Set Inspection
Maintenance Schedule
Inspect every 500K cycles.
Replace as needed.
Procedure
Set the Die Set on a table and press the top plate straight down at both ends at
the same time [1] and look for a smooth operation. The top plate and pins should
retract fully when you release.
Figure 1.6 Check For Free Movement.
Reinstall the Die Set into the punch and run several sheets of the customer’s
paper through the punch. Inspect the holes.
•
Holes should be clean and even with no tearing or frayed edges.
•
Holes should be punched completely, leaving no chip attached.
•
Holes should be straight (no skew) and evenly spaced from the edge of the
paper and aligned. See “Idler Roller Inspection and Cleaning” on page 1-20.
[1]
[1]
Summary of Contents for AdvancedPunch
Page 1: ...Document 7712571 Rev C1 23 08 2013 AdvancedPunch Technical Service Manual ...
Page 143: ...Section 5 5 4 Copyright 2009 GBC All rights reserved Advanced Punch Service Manual ...
Page 144: ...Parts List Advanced Punch Service Manual Copyright 2009 GBC All rights reserved 5 5 ...
Page 149: ...Section 5 5 10 Copyright 2009 GBC All rights reserved Advanced Punch Service Manual ...
Page 150: ...Parts List Advanced Punch Service Manual Copyright 2009 GBC All rights reserved 5 11 ...
Page 199: ...Section 8 8 4 Copyright 2009 GBC All rights reserved Advanced Punch Service Manual 2 1 ...
Page 201: ...Section 8 8 6 Copyright 2009 GBC All rights reserved Advanced Punch Service Manual 2 1 2 1 2x ...