![background image](http://html1.mh-extra.com/html/gbc/advancedpunch/advancedpunch_technical-and-service-manual_571056041.webp)
Maintenance
Advanced Punch Service Manual
© Copyright 2009 GBC. All rights reserved.
1-29
1.4.17 Punch Paper Path Inspection and Cleaning
Maintenance Schedule
Inspect and clean every 750K cycles.
Replace idler rollers every 2000K cycles.
Procedure
•
Inspect the entire paper path through the punch. Look for wear, damage, and
obstructions.
•
Inspect the rollers for wear patterns or groves.
•
Open the Aligner Panels [1] and U-channel [2] and make sure there are no
obstructions.
•
Confirm that the latch holds the U-channel (Loop Pivot, Paper Guide
Assembly) tightly in place [2]. If the latch is bent or damaged, replace the U-
channel (See PL 5.3, item 28)
•
Clean as needed.
[1]
[1]
[2]
Summary of Contents for AdvancedPunch
Page 1: ...Document 7712571 Rev C1 23 08 2013 AdvancedPunch Technical Service Manual ...
Page 143: ...Section 5 5 4 Copyright 2009 GBC All rights reserved Advanced Punch Service Manual ...
Page 144: ...Parts List Advanced Punch Service Manual Copyright 2009 GBC All rights reserved 5 5 ...
Page 149: ...Section 5 5 10 Copyright 2009 GBC All rights reserved Advanced Punch Service Manual ...
Page 150: ...Parts List Advanced Punch Service Manual Copyright 2009 GBC All rights reserved 5 11 ...
Page 199: ...Section 8 8 4 Copyright 2009 GBC All rights reserved Advanced Punch Service Manual 2 1 ...
Page 201: ...Section 8 8 6 Copyright 2009 GBC All rights reserved Advanced Punch Service Manual 2 1 2 1 2x ...