141
PRIMERGY TX120 User’s Guide
5
Operatio
ns
a
fter OS In
st
al
lation
3
Right-click the partition to change the letter and click [Change Drive Letter and
Path].
The [Change Drive Letter and Path] window appears.
4
Click [Edit].
The [Change Drive Letter or Path] window appears.
5
Change the drive letter.
5.5.3 Notes on Advanced Uninterruptible Power Supply
(UPS)
Note the following points when using an advanced uninterruptible power supply (referred to as UPS
afterward).
UPS Shutdown Time Setting
Specify enough time for the UPS power-off time (time from the shutdown direction to the actual power-
off). If this time is set insufficiently, the power will be cut off before system shutdown, which may result
in destruction of data. For more details, refer to the manuals for UPS and UPS management software.
Power Supply Control by UPS
Change the BIOS Settings to turn on the server automatically at power recovery or during scheduled
operation using the UPS management software (PowerChute Network Shutdown, PowerChute Business
Edition).
1
Start the BIOS Setup Utility.
"8.2.1 Starting and Exiting the BIOS Setup Utility" (pg.191)
2
Select the [Power On/Off] submenu from the [Advanced] menu, and press the
[Enter] key.
The [Power On/Off] submenu window appears.
3
Set [Power Failure Recovery] to [Always On].
4
Save changes and exit the BIOS Setup Utility.
5.5.4 Turning the Power On via a LAN
You can turn the power on the server from a client (via a LAN) by utilizing the Wakeup on LAN (WOL)
function.
`
Be sure to install ServerView to control the power supply via a LAN.
Summary of Contents for Primergy TX120
Page 6: ...6 ...
Page 12: ...12 ...
Page 122: ...122 Chapter 4 Manual OS Installation ...
Page 152: ...152 Chapter 5 Operations after OS Installation ...
Page 188: ...188 Chapter 7 Installing Hardware Options ...
Page 210: ...210 Chapter 8 Configuring Hardware and Utilities ...
Page 262: ...262 ...