292
Upgrade and Maintenance Manual
RX300
S7
Processors
Ê
"Removing the server cover" on page 72
Ê
"Removing the air duct" on page 73
.c
11.2.3 Installing the processor
11.2.3.1 Opening the load plate of the processor socket
I
This description applies to the following procedures:
– Installing the second CPU in a mono-processor configuration
– Transfering a CPU after replacing the system board (see section
"Swapping processors" on page 495
)
Figure 148: Opening socket release lever 1
Ê
Unlatch the socket release lever marked
Open 1st
by pushing it down and
away from the socket (1).
Ê
The socket release lever will slightly lift up (2).
Summary of Contents for PRIMERGY RX300 S7
Page 6: ...Upgrade and Maintenance Manual RX300 S7 ...
Page 26: ...26 Upgrade and Maintenance Manual RX300 S7 ...
Page 30: ...30 Upgrade and Maintenance Manual RX300 S7 Introduction ...
Page 42: ...42 Upgrade and Maintenance Manual RX300 S7 Before you start ...
Page 116: ...116 Upgrade and Maintenance Manual RX300 S7 Basic software procedures ...
Page 136: ...136 Upgrade and Maintenance Manual RX300 S7 Power supply ...
Page 176: ...176 Upgrade and Maintenance Manual RX300 S7 Hard disk drives solid state drives ...
Page 186: ...186 Upgrade and Maintenance Manual RX300 S7 System fan ...
Page 334: ...334 Upgrade and Maintenance Manual RX300 S7 Processors ...
Page 406: ...406 Upgrade and Maintenance Manual RX300 S7 Accessible drives ...
Page 498: ...498 Upgrade and Maintenance Manual RX300 S7 System board and components ...
Page 524: ...524 Upgrade and Maintenance Manual RX300 S7 Conversion configurations ...
Page 560: ...560 Upgrade and Maintenance Manual RX300 S7 Appendix ...