300
Upgrade and Maintenance Manual
RX300
S7
Processors
Figure 156: Closing socket release lever 1
Ê
Close the socket release lever marked
Open 1st
(1) and latch it under the
load plate retention tab (2).
Ê
If applicable, install the second processor accordingly.
11.2.4 Concluding steps
Perform the following procedures:
Ê
"Installing processor heat sinks" on page 325
Ê
"Installing the air duct" on page 74
Ê
"Mounting the server cover" on page 76
Ê
"Sliding the server into the rack" on page 80
If the server has been completely removed from the rack for maintenance
purposes, reinstall and secure it in the rack as described in section
"Mounting the server cover" on page 76
.
Ê
Reconnect all external cables.
Summary of Contents for PRIMERGY RX300 S7
Page 6: ...Upgrade and Maintenance Manual RX300 S7 ...
Page 26: ...26 Upgrade and Maintenance Manual RX300 S7 ...
Page 30: ...30 Upgrade and Maintenance Manual RX300 S7 Introduction ...
Page 42: ...42 Upgrade and Maintenance Manual RX300 S7 Before you start ...
Page 116: ...116 Upgrade and Maintenance Manual RX300 S7 Basic software procedures ...
Page 136: ...136 Upgrade and Maintenance Manual RX300 S7 Power supply ...
Page 176: ...176 Upgrade and Maintenance Manual RX300 S7 Hard disk drives solid state drives ...
Page 186: ...186 Upgrade and Maintenance Manual RX300 S7 System fan ...
Page 334: ...334 Upgrade and Maintenance Manual RX300 S7 Processors ...
Page 406: ...406 Upgrade and Maintenance Manual RX300 S7 Accessible drives ...
Page 498: ...498 Upgrade and Maintenance Manual RX300 S7 System board and components ...
Page 524: ...524 Upgrade and Maintenance Manual RX300 S7 Conversion configurations ...
Page 560: ...560 Upgrade and Maintenance Manual RX300 S7 Appendix ...