Concluding steps
▶
"Installing a chassis foam" on page 72
.
▶
"Installing the air duct" on page 74
▶
.
▶
"Connecting the power cord" on page 62
.
▶
"Switching on the server" on page 66
.
▶
If applicable,
"Installing the front cover with lock" on page 66
.
▶
"Verifying system information backup or restore" on page 82
.
▶
"Resuming BitLocker functionality" on page 93
14.4
Front VGA
14.4.1
Installing the front VGA
Upgrade and Repair Unit
(URU)
Hardware: 5 minutes
Tools:
– Phillips PH2 / (+) No. 2 screw driver (for cover 2)
– hexagon screw driver 5 mm (for front VGA)
Preliminary steps
▶
If applicable,
"Removing the front cover with lock" on page 48
▶
"Shutting down the server" on page 48
▶
"Disconnecting the power cord" on page 49
▶
"Getting access to the component" on page 52
▶
"Removing the air duct" on page 73
Front panel
330
Upgrade and Maintenance Manual
RX2530 M6
Summary of Contents for PRIMERGY RX2530 M5
Page 18: ...Content Upgrade and Maintenance Manual RX2530 M6 ...
Page 194: ...Fans 194 Upgrade and Maintenance Manual RX2530 M6 ...
Page 262: ...Expansion cards and backup units 262 Upgrade and Maintenance Manual RX2530 M6 ...
Page 278: ...Main memory 278 Upgrade and Maintenance Manual RX2530 M6 ...
Page 324: ...Accessible drives 324 Upgrade and Maintenance Manual RX2530 M6 ...
Page 336: ...Front panel 336 Upgrade and Maintenance Manual RX2530 M6 ...
Page 344: ...Serial interface 344 Upgrade and Maintenance Manual RX2530 M6 ...
Page 480: ...List of all used screws for PRIMERGY Servers Assembled in Germany and Japan February 2019 ...