03-03
+2
Cooling priority
Heating priority
Method 3. (Management by indoor unit)
Operation mode management is made "Management by indoor unit" by RB unit DIP-SW
(field setting).
Then the master indoor unit is set by wired remote controller.
Thereupon the priority mode shifts to Cooling Priority or Heating Priority in accordance with input
from the master indoor unit regardless of the current priority mode.
The priority mode is fixed at either cooling or heating even if the master indoor unit stops
Cooling/Heating switching can be performed by the master indoor unit only.
(5) Opposite operation mode ( for connectable type )
When the operation mode commanded from an indoor unit (remote controller) and the operation mode
allowed by the system (cooling and dry operation for cooling only type and operation mode allowed by
priority mode for heat pump type) do not match, it is indicated by blinking of an LED.
Timer lamp: 3 secs ON/1 sec OFF repeated
(4) Priority mode ( for connectable type )
The purpose of the priority mode is to restrict operation commands (heating, cooling) from the
connected outdoor air units. There are 3 priority modes of Neutral, Cooling Priority, and Heating Priority.
The operation modes restricted by each of these modes are as follows:
Priority mode
Neutral
Cooling priority
Heating priority
Restricted operation mode
No restrictions
Heating
Cooling
Neutral
Cooling priority
Heating priority
Cooling priority
Heating priority
Priority mode decision methods
Method 1. (Default value)
The initial priority mode is made Neutral and is shifted to Cooling Priority when cooling and to Heating
Priority when heating depending on which operation mode (cooling, heating) was input first.
After shifting to Cooling Priority or Heating Priority, the priority mode shifts to Neutral only when there
was a Stop input from all the indoor units in the same RB Group.
Method 2. (Management by RB unit)
Operation mode management is made "Management by RB unit" by RB unit DIP-SW
(field setting).
The priority mode shifts to Cooling Priority or Heating Priority in accordance with input from the RB
unit regardless of the current mode.
Summary of Contents for Airstage UTP-RU01AH
Page 1: ...SERVICE MANUAL 208 230V 60Hz ...
Page 5: ...1 TEST RUN ...
Page 6: ......
Page 34: ...2 OUTDOOR UNIT OPERATION CONTROL ...
Page 59: ...3 INDOOR UNIT OPERATION ...
Page 60: ......
Page 82: ......
Page 83: ...4 TROUBLE SHOOTING ...
Page 84: ......
Page 186: ...04 96 0 24 AOUA120 208 230 AOUA72 90 0 19 RED WHITE BLACK U V W ...
Page 208: ...5 APPENDING DATA UNIT ...
Page 209: ......
Page 215: ...CASSETTE TYPE MODELS AUUB18TLAV AUUB24TLAV AUUB30TLAV AUUB36TLAV 05 06 ...
Page 217: ...MEDIUM STATIC PRESSURE DUCT TYPE MODEL ARUM24TLAV 05 08 MODEL ARUM30TLAV ARUM36TLAV ...
Page 218: ...HIGH STATIC PRESSURE DUCT TYPE MODELS ARUH36TLAV ARUH48TLAV ARUH60TLAV 05 09 ...
Page 219: ...FLOOR CEILING TYPE MODELS ABUA12TLAV ABUA14TLAV ABUA18TLAV ABUA24TLAV 05 10 ...
Page 220: ...CEILING TYPE MODELS ABUA30TLAV ABUA36TLAV INDOOR UNITS INDOOR UNITS 05 11 ...
Page 221: ...WALL MOUNTED TYPE MODELS ASUA7TLAV ASUA9TLAV ASUA12TLAV ASUA14TLAV 05 12 ...
Page 222: ...MODELS ASUB18TLAV ASUB24TLAV 05 13 ...
Page 224: ...MODEL UTP RU01AH MODEL UTP RU01BH 5 2 3 RB Unit 05 15 ...
Page 225: ...MODEL UTP RU01CH 05 16 ...
Page 226: ...MODEL UTP RU04BH 05 17 ...
Page 227: ...MODELS AAUA48TLAV 5 2 4 Outdoor Air Unit 05 18 MODELS AAUA72TLAV ...
Page 228: ...MODELS AAUA96TLAV 05 19 ...
Page 230: ...6 DISASSEMBLY PROCESS ...
Page 245: ......