
13
Chapter 4 WIRING AND CABLING
• Before starting installation, turn off the power to the inverter and wait for at least five minutes. Further,
check the DC link circuit voltage between the P (+) and N (-) terminals to be lower than 25 VDC.
• Qualified electricians should carry out wiring.
Otherwise, electric shock could occur.
The inverter, motor, and wiring emit electrical noise. Take appropriate measures to prevent the nearby
sensors and devices from malfunctioning due to such noise.
Otherwise, an accident could occur.
4.1 Basic Connection Diagram
L1/R
U
V
W
CM
+DC24V
L2/S
L3/T
PLC
0V
G
Grounding
terminal
FRENIC-Multi
OPC-E1-DEV
0V
24V
E
CAN L
V-
Shield
CAN H
V+
DeviceNet cable
DeviceNet
terminal block
Power supply
terminal block
Motor
G
M
To
DeviceNet
Figure 4.1 Basic Connection Diagram
Summary of Contents for FRENIC-Multi OPC-E1-DEV
Page 40: ...38 MEMO...