
9
Chapter 3 INSTALLATION OF THIS OPTION
Turn the inverter's power OFF and wait for at least five minutes. Further, check that the DC link bus voltage
between the P (+) and N (-) terminals is lower than 25 VDC.
Otherwise, electric shock could occur.
• Do not use the product that is damaged or lacking parts.
Doing so could cause a fire, accident, or injury.
• Prevent lint, paper fibers, sawdust, dust, metallic chips, or other foreign materials from getting into
the inverter and the option.
Otherwise, a fire or an accident might result.
• Incorrect handling in installation/removal jobs could cause a failure.
A failure might result.
When handling this option, take any antistatic measure or hold the plastic parts taking care not to directly touch
the circuit board; otherwise, the static electricity charged in your body may damage it.
Summary of Contents for FRENIC-Multi OPC-E1-DEV
Page 40: ...38 MEMO...