43
EN
-U
S
Commissioning
Requirements for
Commissioning
The following requirements must be fulfilled for commissioning:
-
Torch body change station bolted to the surface and supplied with compressed air
-
All torch body sensors tested, wire sensor set up
-
All torch bodies prepared
-
Torch body coupling installed
-
Function of the torch body coupling checked
-
The robot has been set up using the robot programming aid
-
WF 30i TWIN installed in the welding system
Start-up
Torch body change station start-up is initiated by an active signal from the robot controller.
Important infor
-
mation regarding
operation
CAUTION!
Risk of injury from falling objects.
For example, objects may fall due to unintended or unintentional decoupling or coupling
errors.
► Wear a protective helmet suitable for industrial applications in the operating area of the
robot and torch body change station!
► Do not remain underneath the robot arm!
CAUTION!
Risk of damage due to impermissible force!
► Except for the Fronius components, there must be no other parts on or mounted on the
torch body change station!
► During operation, observe the max. permissible forces in accordance with the figures
below!
Max. permissible force exerted by the robot on the
upright console
Max. permissible force exerted by the robot on the
wall-mounted console - regardless of whether the wall-
mounted console is mounted on the rear of the device
or on the right-hand side of the device
max. 100 N
F
max. 100 N
F