The startup test can take anything from just a few seconds up to several minutes de-
pending on national regulations. The time elapsed is indicated by a bar shrinking from
the top down.
Whenever two scale divisions stop flashing and disappear, 1/10 of the total duration
of the test is over.
Operation of
Feeding Energy
into the Grid
-
Once the tests have been completed, the inverter starts feeding power into the grid.
-
The display shows the present power feeding into the grid.
-
The Operating Status LED lights up green, and the inverter starts operating.
Summary of Contents for IG Plus 100 V-1
Page 2: ...0...
Page 4: ...2...
Page 10: ...8...
Page 16: ...14...
Page 17: ...General Information...
Page 18: ......
Page 20: ...18 Safety symbols Risk of serious injury and damage due to incorrect operation...
Page 24: ...22...
Page 25: ...Installation and Startup...
Page 26: ......
Page 76: ...74 1 2 6 x 18...
Page 80: ...78 Closing Fronius IG Plus Closing Fronius IG Plus 1 1 3 2 1 1 2 3 2 4 1 3...
Page 89: ...Operation...
Page 90: ......
Page 126: ...124...
Page 127: ...Troubleshooting and Maintenance...
Page 128: ......
Page 146: ...144 Disconnect DC wire Disconnect AC wire 8 9...
Page 150: ...148...
Page 151: ...Appendix...
Page 152: ......
Page 164: ...162...
Page 165: ...163 g...
Page 167: ...165 g...