
79
g
Inserting Option Cards
Suitable Option
Cards
There are several options and system upgrades available for the inverter, e.g.:
-
Datalogger and modem interfaces (for using a PC to record and manage data from
your photovoltaic system)
-
Various large displays (public display)
-
Actuators / relays / alarms (signal card)
System upgrades come in the form of plug-in cards. The inverter can be equipped with
three option cards.
Safety
Inserting option
cards into the
Fronius IG Plus
WARNING!
An electric shock can be fatal. Danger due to grid voltage and DC
voltage from solar modules.
-
The connection area should only be opened by a licensed electrician.
-
Never work with live wires! Prior to all connection work, make sure that the
AC and DC wires are not charged.
WARNING!
An electric shock can be fatal. Danger from residual voltage from ca-
pacitors.
You must wait until the capacitors have discharged. Discharge takes 5 minutes.
NOTE!
Follow general ESD precautions when handling option cards.
1
1
4
7 8
1
3
2
5 6
2
Summary of Contents for IG Plus 100 V-1
Page 2: ...0...
Page 4: ...2...
Page 10: ...8...
Page 16: ...14...
Page 17: ...General Information...
Page 18: ......
Page 20: ...18 Safety symbols Risk of serious injury and damage due to incorrect operation...
Page 24: ...22...
Page 25: ...Installation and Startup...
Page 26: ......
Page 76: ...74 1 2 6 x 18...
Page 80: ...78 Closing Fronius IG Plus Closing Fronius IG Plus 1 1 3 2 1 1 2 3 2 4 1 3...
Page 89: ...Operation...
Page 90: ......
Page 126: ...124...
Page 127: ...Troubleshooting and Maintenance...
Page 128: ......
Page 146: ...144 Disconnect DC wire Disconnect AC wire 8 9...
Page 150: ...148...
Page 151: ...Appendix...
Page 152: ......
Page 164: ...162...
Page 165: ...163 g...
Page 167: ...165 g...