
92
Startup Phase and Grid Feed-in Mode
Startup phase
The inverter carries out a self test after being turned on automatically. Then a test of the
public grid is carried out. This test can take from several seconds up to several minutes
depending on local regulations. During the startup sequence the illumination of the Oper-
ating Status LED is orange.
Test Procedure
1.
Segment test
All display elements light up for about one second
2.
Self test of important inverter components
-
The inverter goes through a master check list for several seconds
-
The display will show "TEST" as well as the component currently being tested
(e.g., "LED")
3.
Synchronization with grid:
-
"WAIT PS" is displayed, the inverter icon flashes: The inverter waits for all power
stage sets on the grid to be operational. This procedure is dependent on the DC
voltage.
-
Next, the display shows "SYNC AC," the grid icon flashes
4.
Startup test
-
Before the inverter begins feeding power into the grid, grid conditions are tested
according to local regulations.
-
The display shows "START UP"
Summary of Contents for IG Plus 100 V-1
Page 2: ...0...
Page 4: ...2...
Page 10: ...8...
Page 16: ...14...
Page 17: ...General Information...
Page 18: ......
Page 20: ...18 Safety symbols Risk of serious injury and damage due to incorrect operation...
Page 24: ...22...
Page 25: ...Installation and Startup...
Page 26: ......
Page 76: ...74 1 2 6 x 18...
Page 80: ...78 Closing Fronius IG Plus Closing Fronius IG Plus 1 1 3 2 1 1 2 3 2 4 1 3...
Page 89: ...Operation...
Page 90: ......
Page 126: ...124...
Page 127: ...Troubleshooting and Maintenance...
Page 128: ......
Page 146: ...144 Disconnect DC wire Disconnect AC wire 8 9...
Page 150: ...148...
Page 151: ...Appendix...
Page 152: ......
Page 164: ...162...
Page 165: ...163 g...
Page 167: ...165 g...