
34
Connecting the Fronius IG Plus to the Public Grid
(AC)
Monitoring the
Grid
Installations with
Several Inverters
For larger photovoltaic systems, it is possible to connect several inverters in parallel with-
out any problems. To ensure symmetrical feeding, connect the inverters uniformly to all 3
phases.
AC-Side Termi-
nals
IMPORTANT!
The resistance in the leads to the AC-side connection terminals must be as
low as possible for optimal functioning of grid monitoring.
One-Phase Inverters
Two-Phase Inverters
Three-Phase Inverters
Legend:
L1
Phase conductor
L2
Phase conductor
L3
Phase conductor
PE
PE conductor *)
N
Neutral conductor
(a)
Grounding electrode terminal *)
(b)
Terminal for possible grounding of
the solar module frame
(c)
"US Sense" terminal (for USA) *)
max. cable cross section 25 mm²
*)
IMPORTANT:
Only one PE con-
ductor terminal is available on the
Fronius IG Plus 100V-2.
(a)(b)
(c)
(a)
(c)
(b)
(a)
(c)
(b)
Summary of Contents for IG Plus 100 V-1
Page 2: ...0...
Page 4: ...2...
Page 10: ...8...
Page 16: ...14...
Page 17: ...General Information...
Page 18: ......
Page 20: ...18 Safety symbols Risk of serious injury and damage due to incorrect operation...
Page 24: ...22...
Page 25: ...Installation and Startup...
Page 26: ......
Page 76: ...74 1 2 6 x 18...
Page 80: ...78 Closing Fronius IG Plus Closing Fronius IG Plus 1 1 3 2 1 1 2 3 2 4 1 3...
Page 89: ...Operation...
Page 90: ......
Page 126: ...124...
Page 127: ...Troubleshooting and Maintenance...
Page 128: ......
Page 146: ...144 Disconnect DC wire Disconnect AC wire 8 9...
Page 150: ...148...
Page 151: ...Appendix...
Page 152: ......
Page 164: ...162...
Page 165: ...163 g...
Page 167: ...165 g...