
77
g
Opening Fronius
IG Plus for Ser-
vice/Maintenance
Procedure for opening the inverter for service or maintenance:
Disconnect AC and DC supply from the inverter
Open the connection area
Turn off DC main switch
Allow the capacitors to discharge (5 minutes)
Remove metal covers
If present, remove the fuse for the solar module ground
If present, remove string fuses
Disconnect DC wire
Disconnect AC wire
Inserting a fuse:
Inserting the "100 kohm Grounding
Kit" option:
*)
The plastic bolts are included in
the inverter scope of delivery
*)
Remove standard fuse holder with
plastic bolt
Fronius recommends a fuse with 1 A and
a dimension of 10 x 38 mm for solar mod-
ule grounding.
Insert the "100 kohm Grounding Kit" op-
tion into the fuse holder completely with
the plastic jacket
Inserting the fuse will ground the solar
module at the positive pole.
Inserting the "100 kohm Grounding Kit"
option grounds the solar module at the
positive pole via a high ohm resistor.
4
1
2
3
*)
1
3
1
2
*)
1
1
2
3
4
5
6
7
8
9
Summary of Contents for IG Plus 100 V-1
Page 2: ...0...
Page 4: ...2...
Page 10: ...8...
Page 16: ...14...
Page 17: ...General Information...
Page 18: ......
Page 20: ...18 Safety symbols Risk of serious injury and damage due to incorrect operation...
Page 24: ...22...
Page 25: ...Installation and Startup...
Page 26: ......
Page 76: ...74 1 2 6 x 18...
Page 80: ...78 Closing Fronius IG Plus Closing Fronius IG Plus 1 1 3 2 1 1 2 3 2 4 1 3...
Page 89: ...Operation...
Page 90: ......
Page 126: ...124...
Page 127: ...Troubleshooting and Maintenance...
Page 128: ......
Page 146: ...144 Disconnect DC wire Disconnect AC wire 8 9...
Page 150: ...148...
Page 151: ...Appendix...
Page 152: ......
Page 164: ...162...
Page 165: ...163 g...
Page 167: ...165 g...