4.5.14 Installing the WOS system
❒ Remove the pre-punched blanking in the insulation side panel on the same side
as the brass bushing
➥ File rough edges using a half-round file and remove burrs
❒ Slide the plastic cover onto the WOS lever
S3 Turbo 18/28:
S3 Turbo 36/45:
❒ Remove the heat exchanger cover
❒ Hang the WOS turbulators on the linking plate of the stay tube
➥ Make sure that you fit the turbulators in the right direction:
➥ Hold the linking plate with the edge toward the top
➥ Hang the WOS turbulators over the edge
Assembly
4
Installing the boiler
Installation Instructions S3 Turbo | M1080813_en
49
All manuals and user guides at all-guides.com