Table of Contents
1
General
4
2
Safety
5
2.1
Hazard levels of warnings
5
2.2
Qualification of assembly staff
6
2.3
Protective equipment for assembly staff
6
2.4
Design Information
7
2.4.1
Notes on standards
7
General standards for heating systems
7
Standards for structural and safety devices
7
Standards for heating water
7
Standards for permitted fuels
8
2.4.2
Installation and approval of the heating system
8
2.4.3
General information for installation room (boiler room)
8
2.4.4
Requirements for central heating water
9
2.4.5
Notes for using pressure maintenance systems
10
2.4.6
Return lift
10
2.4.7
Combination with storage tank
11
2.4.8
Chimney connection/chimney system
13
Draught limiter
13
Boiler data for planning the flue gas system
13
3
Technology
14
3.1
Dimensions
14
3.2
Components and connections
15
3.3
Technical specifications
16
4
Assembly
19
4.1
Materials supplied
19
4.1.1
Tools required
19
4.2
Positioning
20
4.2.1
Temporary storage
20
4.3
Setting up in the boiler room
21
4.3.1
Remove boiler from pallet
21
4.3.2
Moving the boiler in the boiler room
21
4.3.3
Minimum distances in the boiler room
22
4.4
Before Installation
22
4.4.1
Changing door stops (as needed)
22
Converting the fuel loading door
24
4.4.2
Fitting the door handles
25
4.4.3
Setting and checking the seal on the doors
26
Positioning the doors
27
4.5
Installing the boiler
28
4.5.1
Assembly overview
28
Insulation
28
Air duct system
30
WOS system S3 Turbo 18-28
32
WOS system S3 Turbo 36-45
34
Table of Contents
2
Froeling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.at
All manuals and user guides at all-guides.com