5 Start-up
5.1 Before commissioning / configuring the boiler
The boiler must be adjusted to the heating system during commissioning.
NOTICE
Optimum efficiency and efficient, low-emission operation can only be guaranteed
if the system is set up by trained professionals and the standard factory settings
are observed.
Take the following precautions:
❒ Initial startup should be carried out with an authorised installer or with Froling
customer services
❒ Adjust the boiler controller to the system type
❒ Apply boiler standard values
NOTICE! The keypad assignment and the steps necessary to modify the parameters
are detailed in the operating instructions for the boiler control unit.
❒ Check the system pressure of the heating system
❒ Check that the heating system is completely vented
❒ Check that the safety devices are present and working correctly
❒ Check that there is sufficient ventilation in the boiler room
❒ Check the seal of the boiler
➥ All doors and inspection openings must be tightly sealed!
❒ Check that drives and actuators are working and turning in the right direction
NOTICE! For how to check the analogue and digital outputs, see the operating instruc‐
tions for the boiler controller
❒ Check that the door contact switch is working correctly
NOTICE! For how to check the digital inputs see the operating instructions for the boil‐
er controller.
5
Start-up
Before commissioning / configuring the boiler
62
Froeling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.at
All manuals and user guides at all-guides.com