81
PB
R-410A SEALED SYSTEM REPAIR
Service Valves Appearance
2-way Valve (Liquid Side)
Shaft position
3-way Valve (Gas Side)
Shaft position
Service port
Closed
Closed
(with cap)
Closed
(with valve cap)
Closed
(with valve cap)
Closed
(clockwise)
Closed
(with cap)
Open
(with valve cap)
Open
(with valve cap)
Closed
(clockwise)
gauge)
Open
Open
Open
(counter-clockwise) (connected manifold
Open
Open
(with charging
cylinder)
Open
Open
Open
Open
(with charging
cylinder)
Open
Open
Open
Works
Shipping
Air purging
(Installation)
Operation
Evacuation
Pumping down
(Transfering)
(Servicing)
Gas charging
(Servicing)
Pressure check
(Servicing)
Gas releasing
(Servicing)
1.
2.
3.
4.
5.
6.
Valve cap
Open position
Closed position
Pin
Service
port
Service
port cap
To outdoor unit
Flare nut
To
piping
connection
To outdoor unit
Hexagonal wrench (4mm)
Open position
Closed position
To
piping
connection
Flare nut
Open
(with charging cylinder)
Open
(with charging cylinder)
(clockwise)
Open
(with vacumm pump)
Fig. 504
Summary of Contents for Floating Air Pro-Premiere FPHFW18A3A
Page 25: ...25 INSTALLATION Installation Dimension Diagram Figure 401 ...
Page 26: ...26 INSTALLATION Main Tools For Installation and Maintenance Figure 402 ...
Page 34: ...34 INSTALLATION Install Outdoor Unit Fig 431 ...
Page 35: ...35 INSTALLATION Outdoor Units ...
Page 40: ...40 MAINTENANCE Fig 501 ...
Page 59: ...59 TROUBLESHOOTING Error Code 13 Fig 708 Error Code 8 ...
Page 62: ...62 TROUBLESHOOTING Error Code 20 DC fan motor test point Fig 711 ...
Page 68: ...68 Fig 716 TROUBLESHOOTING Error Code 36 ...
Page 73: ...73 COMPONENTS TESTING Fan Motor ...
Page 87: ...87 WIRING DIAGRAMS Outdoor Units Figure 805 9 36K Outdoor Units ...