Franke Kaffeemaschinen AG
TD-100441.doc
4 / 7
4
Wiring up the green cables and the supplied cable tree
Fig. 5:
Pass both green cables coming directly from the transformer through the
opening of the power distributor carrier.
Fig. 6:
Remount the power distributor carrier and fasten the terminal strip of the
cable tree to the prepared fixing position (Pos. 1).
Connect the green cables to both sides of the terminal strip
(Pos. 2 / 3). Insert the five-pole plug of the cable tree in Pos. 4.
Pos 1
Pos 2, 3
Pos4
Pos2
Summary of Contents for Flair
Page 2: ......
Page 4: ......
Page 6: ......
Page 22: ......
Page 76: ......
Page 77: ...TD 100350 doc ...
Page 78: ......
Page 79: ...TD 100351 doc ...
Page 80: ......
Page 81: ...TD 100352 doc ...
Page 82: ......
Page 84: ......
Page 86: ......
Page 88: ......
Page 114: ......
Page 116: ......
Page 120: ......
Page 126: ......
Page 128: ......
Page 138: ......
Page 139: ...Franke Kaffeemaschinen AG TD 100470 doc 1 32 Operating Instructions for Inkasso3 ...