Theory of Operation
Inguard Software Description
2
2-63
Self-Test Command
2-121.
The self-test command from the outguard causes the following tests to be performed, in
the order given. If the A/D test fails, the tests that require the A/D (zero offset test,
reference balance test, ohms overload test) are not done.
A/D Test
2-122.
This test simply triggers the A/D and waits for either the A/D interrupt or a timeout. If
the timeout occurs before receiving an A/D interrupt, the test fails and the A/D is
assumed to be non-functional. The timeout is set to 10 ms, greater than either the 2640A
or 2645A A/D reading time.
Zero Offset Test
2-123.
The zero offset test measures the four zero offsets, and ascertains that they are within
reasonable limits. The test fails if any of the offsets measures greater than 2000 counts
(2645A) or 12000 counts (2640A). This is approximately 0.175 volts. A typical zero
offset measurement is approximately 0.1 volts.
Reference Balance Test
2-124.
The reference balance test measures the two reference balance values. The individual
counter values (N counts and P counts) are tested against limits, as are the differences
between the counter values. For both references on, each counter must be less than
0x8000, and their difference must be less than 0x6000. For both references off, each
counter must be less than 0x2000, and their difference must be less than 0x200.
Ohms Overload Test
2-125.
For this test, a two-wire ohms measurement is attempted without any channel selected
(however the tree and function relays must be set). This should result in an overload.
Any other value causes the test to fail.
OTC Test
2-126.
The OTC test attempts to do an open-thermocouple check with no channel selected.
Unless this results in an “open” indication, the test fails.
Summary of Contents for NetDAQ 2640A
Page 14: ...NetDAQ Service Manual x...
Page 46: ...NetDAQ Service Manual 2 4...
Page 106: ...NetDAQ Service Manual 2 64...
Page 108: ...NetDAQ Service Manual 3 2...
Page 164: ...NetDAQ Service Manual 4 42...
Page 206: ...NetDAQ Service Manual 6 2...
Page 218: ...NetDAQ Service Manual 6 14 2645A 1601 Figure 6 2 A1 Main PCA Assembly...
Page 220: ...NetDAQ Service Manual 6 16 2620A 1601 Figure 6 3 A2 Display PCA Assembly...
Page 230: ...NetDAQ Service Manual 6 26 2645A 1603 Figure 6 5 2645A A3 A D Converter PCA Assembly...
Page 234: ...NetDAQ Service Manual 7 2...
Page 242: ...2640A 2645A Service Manual 7 10 Figure 7 2 A2 Display PCA Assembly 2620A 1602...
Page 243: ...Schematic Diagrams 7 7 11 Figure 7 2 A2 Display PCA Assembly cont 2620A 1002...
Page 251: ...Schematic Diagrams 7 7 19 2645A 1603 Figure 7 4 2645A A3 A D Converter PCA Assembly 2645A 1603...
Page 258: ...2640A 2645A Service Manual 7 26 Figure 7 5 A4 Analog Input PCA Assembly 2620A 1604...
Page 260: ...2640A 2645A Service Manual 7 28...