Comark RF500A/AP Service Manual
Tier 1: RF500A Functional Testing
Network Test
Initial Conditions:
•
Mains Power Attached
•
RF500A/AP successfully booted and website running
Alarm Output Test
Initial Conditions:
•
Mains Power Attached
•
RF500A/AP successfully booted and website running
This test requires the use of the 2.5mm jack lead (Comark P/N: RFJACK) and DMM continuity tester. The RF500A/AP
should be plugged in and switched on with website running and viewable. The alarm outputs can both be configured as
normally open or normally closed as per the users requirements. This procedure assumes starting with the alarm outputs
configured as normally open.
This should be applied to both alarm outputs. Once the test has been completed the alarm relay outputs should be
returned to their original settings. This procedure can also be used starting from the normally open initial condition just
checking the connection opens instead of indicating closed.
17 November 2011
Page 28 of 65
PLUG IN NETWORK CABLE
ARE LAN
CONNECTOR
LEDs
ON
SUCCESSFUL TEST
No
FAULT
PLUG IN ALARM CABLE
SUCCESSFUL TEST
No
FAULT
FROM HARDWARE PAGE
ACTIVATE ALARM RELAY
OUTPUT
DID THE DMM
INDICATE
CLOSED
CONNECTION