13. Reinstall the check valve assembly and end cap to-
gether by sliding the end cap along the tie rods and
guiding the high-pressure cylinder into the bronze
bushing of the end cap. Take care to align the check
valve assembly with the correct orientation as previ-
ously noted in Step 5.
14. Reload the intensifier tie rods.
•
See
Maintenance Procedure A
, Assembling the
Intensifier
15. Reconnect the high-pressure tubing and the inlet
water hose.
26 | M-376
© Flow International Corporation
94K HYPERPRESSURE INTENSIFIER
Summary of Contents for 94K HYPERPRESSURE
Page 1: ...94K HYPERPRESSURE INTENSIFIER M 376 REV G JUNE 2012...
Page 4: ...Notes 4 M 376 Flow International Corporation 94K HYPERPRESSURE INTENSIFIER...
Page 14: ...Replacement parts 14 M 376 Flow International Corporation 94K HYPERPRESSURE INTENSIFIER...
Page 16: ...Notes 16 M 376 Flow International Corporation 94K HYPERPRESSURE INTENSIFIER...
Page 30: ...Notes 30 M 376 Flow International Corporation 94K HYPERPRESSURE INTENSIFIER...
Page 36: ...Notes 36 M 376 Flow International Corporation 94K HYPERPRESSURE INTENSIFIER...
Page 46: ...Notes 46 M 376 Flow International Corporation 94K HYPERPRESSURE INTENSIFIER...
Page 62: ...Notes 62 M 376 Flow International Corporation 94K HYPERPRESSURE INTENSIFIER...
Page 64: ...64 M 376 Flow International Corporation 94K HYPERPRESSURE INTENSIFIER...
Page 65: ...Flow International Corporation M 376 65 CHAPTER 4 Troubleshooting...