8. Pry the seal carrier away from the end bell using a
small pry bar in the groove provided, as shown.
Once the seal carrier is away from the end bell, slide
it off the ceramic plunger by hand.
9. Clean and inspect the high-pressure cylinder, filler
tube, and plunger.
10. Place the new seal carrier assembly onto the plunger.
Using the filler tube as a tool, push the assembly
along the plunger until it butts against the end bell
face.
11. Slide the high-pressure cylinder over the ceramic
plunger and into the end bell bushing. A slight rock-
ing motion will help ease the cylinder into position.
12. Install the filler tube in the high-pressure cylinder.
CAUTION
Make sure the filler tube is oriented correctly. There
is a wall inside the tube that must be at the outermost
end of the tube when it is inserted. Failure to orient the
tube correctly will damage the intensifier assembly.
© Flow International Corporation
M-376 | 25
CHAPTER 3
Maintenance Procedures
Summary of Contents for 94K HYPERPRESSURE
Page 1: ...94K HYPERPRESSURE INTENSIFIER M 376 REV G JUNE 2012...
Page 4: ...Notes 4 M 376 Flow International Corporation 94K HYPERPRESSURE INTENSIFIER...
Page 14: ...Replacement parts 14 M 376 Flow International Corporation 94K HYPERPRESSURE INTENSIFIER...
Page 16: ...Notes 16 M 376 Flow International Corporation 94K HYPERPRESSURE INTENSIFIER...
Page 30: ...Notes 30 M 376 Flow International Corporation 94K HYPERPRESSURE INTENSIFIER...
Page 36: ...Notes 36 M 376 Flow International Corporation 94K HYPERPRESSURE INTENSIFIER...
Page 46: ...Notes 46 M 376 Flow International Corporation 94K HYPERPRESSURE INTENSIFIER...
Page 62: ...Notes 62 M 376 Flow International Corporation 94K HYPERPRESSURE INTENSIFIER...
Page 64: ...64 M 376 Flow International Corporation 94K HYPERPRESSURE INTENSIFIER...
Page 65: ...Flow International Corporation M 376 65 CHAPTER 4 Troubleshooting...