INSTALLATION
19
FC
01- CA
| Flow Meter
Fit monitoring head with locking set as follows (fig. 12):
- Fix first link of chain (1) into the clip (3) (tightening torque 10 Nm).
- Put chain catch (2) into link and fasten with the tight chain.
Caution!
Check locking system with regard to strength!
The locking chain must be mounted as tightly as possible .
Locking set 01
1
chain 4 x 32 DIN 5685 (approx. 1 m)
2
catch for chain NG 5
3
clip with screws and nuts DN15 to DIN 11850
(tightening torque 10 Nm)
3
2
1
fig. 12
Summary of Contents for FC 01- CA
Page 1: ...Flow Meter FC 01 CA USER MANUAL M_FC01 CA_1121_e ...
Page 74: ...Flow Meter FC01 CA 74 ...
Page 75: ...FC01 CA Flow Meter 75 ...