4.4 Instructions on commissioning the PROFIBUS
Switching on the power supply
PLEASE NOTE
Refer also to the switching-on instructions in the user
manual for your controller.
When you switch your controller on, it will automatically
perform a comparison between the NOMINAL and AC-
TUAL configurations. For this configuration run it is im-
portant that:
•
the specifications on configuration are complete and
correct
•
the power supply to the PLC and the field bus slaves
is switched on either simultaneously or in the se-
quence stated below.
4. Commissioning
4-38
SPC200-COM-PDP 9904NH
Summary of Contents for SPC200 Series
Page 1: ...Smart Positioning Controller SPC200 Fieldbus module PROFIBUS DP Type SPC200 COM PDP ...
Page 11: ...X SPC200 COM PDP 9904NH ...
Page 12: ...Chapter 1 System summary 1 System summary SPC200 COM PDP 9904NH 1 1 ...
Page 22: ...Chapter 2 Fitting 2 Fitting SPC200 COM PDP 9904NH 2 1 ...
Page 28: ...Chapter 3 Installation 3 Installation SPC200 COM PDP 9904NH 3 1 ...
Page 38: ...Chapter 4 Commissioning 4 Commissioning SPC200 COM PDP 9904NH 4 1 ...
Page 100: ...Appendix A Technical appendix A Technical appendix SPC200 COM PDP 9904NH A 1 ...
Page 103: ...A Technical appendix A 4 SPC200 COM PDP 9904NH ...
Page 107: ...A Technical appendix A 8 SPC200 COM PDP 9904NH ...