Please observe the following points when switching on
the power supply.
If there is a common supply to the control system and
all the field bus slaves, power should be switched on by
means of a central power unit or switch.
Common
supply
If the control system and the field bus slaves have sep-
arate power supplies, power should be switched on in
the following sequence.
Separate
supply
1. Switch on the power supply for all field bus slaves.
2. Switch on the compressed air supply for the axes
connected to the SPC200.
3. Switch on the power supply for the control system.
4. Commissioning
SPC200-COM-PDP 9904NH
4-39
Summary of Contents for SPC200 Series
Page 1: ...Smart Positioning Controller SPC200 Fieldbus module PROFIBUS DP Type SPC200 COM PDP ...
Page 11: ...X SPC200 COM PDP 9904NH ...
Page 12: ...Chapter 1 System summary 1 System summary SPC200 COM PDP 9904NH 1 1 ...
Page 22: ...Chapter 2 Fitting 2 Fitting SPC200 COM PDP 9904NH 2 1 ...
Page 28: ...Chapter 3 Installation 3 Installation SPC200 COM PDP 9904NH 3 1 ...
Page 38: ...Chapter 4 Commissioning 4 Commissioning SPC200 COM PDP 9904NH 4 1 ...
Page 100: ...Appendix A Technical appendix A Technical appendix SPC200 COM PDP 9904NH A 1 ...
Page 103: ...A Technical appendix A 4 SPC200 COM PDP 9904NH ...
Page 107: ...A Technical appendix A 8 SPC200 COM PDP 9904NH ...