4. Commissioning
4-4
Festo P.BE-CPVSC-EN en 0112NH
1
4
2
5
3
14
12
1
2
1
Externally supplied auxiliary pilot air (3 to 7 bar)
2
Safety start-up valve (slow build up of pressure of
complete supply)
Fig. 4/1: Example of valve-cylinder combination with slow
increase in pressure of the complete supply
The table below shows the effects of slow start-up pressuriza-
tion when there are electric signals.
External auxili-
ary pilot air
Pressure
increase in
complete
supply
Pressure
increase in the
auxiliary pilot
air (12/14)
Time of
switching
point of a
valve
Movement of
the cylinder
Branched after the
safety start-up
valve
slow
slow
after
pressure
increase with (1)
fast
Branched in front
of the safety
start-up valve
slow
fast
before
pressure
increase with (1)
slow
Summary of Contents for Smart cubic CPV-SC Series
Page 2: ......
Page 4: ...Contents and general instructions II Festo P BE CPVSC EN en 0112NH...
Page 12: ...Contents and general instructions X Festo P BE CPVSC EN en 0112NH...
Page 13: ...Summary of components 1 1 Festo P BE CPVSC EN en 0112NH Chapter 1...
Page 20: ...1 Summary of components 1 8 Festo P BE CPVSC EN en 0112NH...
Page 21: ...Fitting 2 1 Festo P BE CPVSC EN en 0112NH Chapter 2...
Page 26: ...2 Fitting 2 6 Festo P BE CPVSC EN en 0112NH...
Page 27: ...Installation 3 1 Festo P BE CPVSC EN en 0112NH Chapter 3...
Page 43: ...Commissioning 4 1 Festo P BE CPVSC EN en 0112NH Chapter 4...
Page 57: ...Maintenance and conversion 5 1 Festo P BE CPVSC EN en 0112NH Chapter 5...
Page 65: ...Technical appendix A 1 Festo P BE CPVSC EN en 0112NH Appendix A...
Page 75: ...Index B 1 Festo P BE CPVSC EN en 0112NH Appendix B...
Page 76: ...B Index B 2 Festo P BE CPVSC EN en 0112NH Contents B Index B 1...