4. Commissioning
4-11
Festo P.BE-CPVSC-EN en 0112NH
4.3
Eliminating faults
Impairment of function
After switching on the compressed air supply or when subse-
quently testing the individual valves, you can learn the follow-
ing about the operating status of the pneumatic system:
Operating status of the
pneumatic system
Valve position
Error treatment when the
compressed air supply has been
switched off
Air escapes ...
– from the common line connections
– from the work line connections
– between the modules
– Basic position
– Switch position
– Basic position
•
Check the seal ring or the tube fit-
tings
•
After switching on again, regulate
the separate auxiliary pilot air to 3
to 7 bar.
The valve or the pneumatic system
– does not react as expected
– does not react
– does not react
– Switch position
– Switch position
– Basic position
•
Check the tubing
•
After switching on again check the
operating pressure (e.g. pressure
zones)
•
Servicing required
– Check the controller connection
(apply pressure
>
3 bar at
controller)
Summary of Contents for Smart cubic CPV-SC Series
Page 2: ......
Page 4: ...Contents and general instructions II Festo P BE CPVSC EN en 0112NH...
Page 12: ...Contents and general instructions X Festo P BE CPVSC EN en 0112NH...
Page 13: ...Summary of components 1 1 Festo P BE CPVSC EN en 0112NH Chapter 1...
Page 20: ...1 Summary of components 1 8 Festo P BE CPVSC EN en 0112NH...
Page 21: ...Fitting 2 1 Festo P BE CPVSC EN en 0112NH Chapter 2...
Page 26: ...2 Fitting 2 6 Festo P BE CPVSC EN en 0112NH...
Page 27: ...Installation 3 1 Festo P BE CPVSC EN en 0112NH Chapter 3...
Page 43: ...Commissioning 4 1 Festo P BE CPVSC EN en 0112NH Chapter 4...
Page 57: ...Maintenance and conversion 5 1 Festo P BE CPVSC EN en 0112NH Chapter 5...
Page 65: ...Technical appendix A 1 Festo P BE CPVSC EN en 0112NH Appendix A...
Page 75: ...Index B 1 Festo P BE CPVSC EN en 0112NH Appendix B...
Page 76: ...B Index B 2 Festo P BE CPVSC EN en 0112NH Contents B Index B 1...