5. Maintenance and conversion
5-6
Festo P.BE-CPVSC-EN en 0112NH
4. Pull the component forwards so that it can be discon-
nected from the plug of the electric circuit. Then lift it up
slightly and pull it forwards away from the tie rod.
Fig. 5/2: Removing a component in a valve location
Fitting a component
Please note
The valve with the work connection sub-base is a unit
tested for leakage by Festo.
– Do
not
disconnect the screw connectors in the work
connection sub-base.
They guarantee that the unit does not leak.
Proceed as follows:
1. Make sure that the seals are correctly seated between the
components on the valve terminal. They must lie correctly
in the appropriate seal grooves.
Summary of Contents for Smart cubic CPV-SC Series
Page 2: ......
Page 4: ...Contents and general instructions II Festo P BE CPVSC EN en 0112NH...
Page 12: ...Contents and general instructions X Festo P BE CPVSC EN en 0112NH...
Page 13: ...Summary of components 1 1 Festo P BE CPVSC EN en 0112NH Chapter 1...
Page 20: ...1 Summary of components 1 8 Festo P BE CPVSC EN en 0112NH...
Page 21: ...Fitting 2 1 Festo P BE CPVSC EN en 0112NH Chapter 2...
Page 26: ...2 Fitting 2 6 Festo P BE CPVSC EN en 0112NH...
Page 27: ...Installation 3 1 Festo P BE CPVSC EN en 0112NH Chapter 3...
Page 43: ...Commissioning 4 1 Festo P BE CPVSC EN en 0112NH Chapter 4...
Page 57: ...Maintenance and conversion 5 1 Festo P BE CPVSC EN en 0112NH Chapter 5...
Page 65: ...Technical appendix A 1 Festo P BE CPVSC EN en 0112NH Appendix A...
Page 75: ...Index B 1 Festo P BE CPVSC EN en 0112NH Appendix B...
Page 76: ...B Index B 2 Festo P BE CPVSC EN en 0112NH Contents B Index B 1...