4. Commissioning
4-10
Festo P.BE-CPVSC-EN en 0112NH
Actuating the manual override with stop
(locking)
Reaction of the valve
Use a screwdriver to carefully
press down the plunger of the
manual override as far as poss-
ible. Then turn it 90° in a clock-
wise direction.
The valve:
– Moves to the switching
position
Leave the plunger in the lower
position.
– Remains in the switch
position
Then turn it 90° in an anti-
clockwise direction. Then
release the plunger.
– Moves back to the basic
position (
not with 5/2-way
double-solenoid valve,
Ident. Code J)
Please note
•
Use a blunt pencil for actuating the non-locking manual
override.
•
Actuate the manual override at 8 bar only with max 25 N.
You will then avoid malfunctioning or damage to the man-
ual override.
Summary of Contents for Smart cubic CPV-SC Series
Page 2: ......
Page 4: ...Contents and general instructions II Festo P BE CPVSC EN en 0112NH...
Page 12: ...Contents and general instructions X Festo P BE CPVSC EN en 0112NH...
Page 13: ...Summary of components 1 1 Festo P BE CPVSC EN en 0112NH Chapter 1...
Page 20: ...1 Summary of components 1 8 Festo P BE CPVSC EN en 0112NH...
Page 21: ...Fitting 2 1 Festo P BE CPVSC EN en 0112NH Chapter 2...
Page 26: ...2 Fitting 2 6 Festo P BE CPVSC EN en 0112NH...
Page 27: ...Installation 3 1 Festo P BE CPVSC EN en 0112NH Chapter 3...
Page 43: ...Commissioning 4 1 Festo P BE CPVSC EN en 0112NH Chapter 4...
Page 57: ...Maintenance and conversion 5 1 Festo P BE CPVSC EN en 0112NH Chapter 5...
Page 65: ...Technical appendix A 1 Festo P BE CPVSC EN en 0112NH Appendix A...
Page 75: ...Index B 1 Festo P BE CPVSC EN en 0112NH Appendix B...
Page 76: ...B Index B 2 Festo P BE CPVSC EN en 0112NH Contents B Index B 1...