4. Commissioning
4-8
Festo P.BE-CPVSC-EN en 0112NH
Checking the valve-cylinder combination
Warning
Before checking the valve-cylinder combination:
– Make sure that nobody is in the danger zone.
Testing
Proceed as follows:
1. Switch on the compressed air supply.
2. Check the functioning and operation of each individual
valve-cylinder combination by actuating the manual over-
ride as shown in the following diagrams.
3. Make sure that all the valves are in their basic positions
before commissioning the valve terminal.
4. Switch off the compressed air supply after checking the
valves.
Summary of Contents for Smart cubic CPV-SC Series
Page 2: ......
Page 4: ...Contents and general instructions II Festo P BE CPVSC EN en 0112NH...
Page 12: ...Contents and general instructions X Festo P BE CPVSC EN en 0112NH...
Page 13: ...Summary of components 1 1 Festo P BE CPVSC EN en 0112NH Chapter 1...
Page 20: ...1 Summary of components 1 8 Festo P BE CPVSC EN en 0112NH...
Page 21: ...Fitting 2 1 Festo P BE CPVSC EN en 0112NH Chapter 2...
Page 26: ...2 Fitting 2 6 Festo P BE CPVSC EN en 0112NH...
Page 27: ...Installation 3 1 Festo P BE CPVSC EN en 0112NH Chapter 3...
Page 43: ...Commissioning 4 1 Festo P BE CPVSC EN en 0112NH Chapter 4...
Page 57: ...Maintenance and conversion 5 1 Festo P BE CPVSC EN en 0112NH Chapter 5...
Page 65: ...Technical appendix A 1 Festo P BE CPVSC EN en 0112NH Appendix A...
Page 75: ...Index B 1 Festo P BE CPVSC EN en 0112NH Appendix B...
Page 76: ...B Index B 2 Festo P BE CPVSC EN en 0112NH Contents B Index B 1...