background image

4. Commissioning

4-13

Festo P.BE-CPVSC-EN en 0112NH

LED display of the valves

There is a yellow LED for every valve solenoid coil. This LED
indicates the switching status of the valve solenoid coil when
the CPV-SC valve terminal is ready for operation. The LEDs are
assigned to the valve locations in numerically ascending
order. Therefore LED 0 is assigned to valve location 0, etc. The
valve locations are numbered in ascending order from left to
right (see diagram).

0
2

1
3

1

2

3

4

1

LED for valve location 0

2

Valve location 0

3

Valve location 3

4

LED for valve location 3

Fig. 4/2: Assignment of LED to valve location

Summary of Contents for Smart cubic CPV-SC Series

Page 1: ...Pneumatics manual CPV SC valve terminal Type CPVSC1 VI Manual 530 926 en 0112NH 659699 Compact performance Smart cubic...

Page 2: ......

Page 3: ...26 E Festo AG Co D 73726 Esslingen Federal Republic of Germany 2001 Internet http www festo com E Mail service_international festo com The copying distribution and utilization of this document as well...

Page 4: ...Contents and general instructions II Festo P BE CPVSC EN en 0112NH...

Page 5: ...wall 2 4 2 2 Fitting the manual override cover optional 2 5 3 Installation 3 1 3 1 Preparing the compressed air 3 3 3 1 1 Operation with non lubricated compressed air 3 3 3 1 2 Operation with lubricat...

Page 6: ...aintenance and conversion 5 1 5 1 Cleaning replacing the large area silencer 5 3 5 2 Fitting removing components in valve locations 5 4 A Technical appendix A 1 A 1 Accessories A 3 A 2 Technical speci...

Page 7: ...ir original state without any modifications by the user in faultless technical condition The maximum values specified for pressures temperatures electrical data torques etc must be observed Please com...

Page 8: ...fic information on fitting installing commissioning servicing and converting the CPV SC valve terminal This manual describes only the pneumatic compo nents and refers to the CPV SC valve terminal with...

Page 9: ...ween the following danger warnings Warning This means that failure to observe this instruction may result in serious personal injury or damage to property Caution This means that failure to observe th...

Page 10: ...ons tips and references to other sources of information Accessories Information on necessary or sensible accessories for the Festo product Environment Information on environment friendly use of Festo...

Page 11: ...he CPV SC valve terminals and micro valve sub bases CPV SC valve terminal Compact Performance valve terminal Smart Cubic type 80 Electrical sub base Sub base with electric multipin connection End plat...

Page 12: ...Contents and general instructions X Festo P BE CPVSC EN en 0112NH...

Page 13: ...Summary of components 1 1 Festo P BE CPVSC EN en 0112NH Chapter 1...

Page 14: ...1 Summary of components 1 2 Festo P BE CPVSC EN en 0112NH Contents 1 Summary of components 1 1 1 1 Description of variants 1 3 1 2 Description of components 1 3...

Page 15: ...the times required for pressurizing and exhausting the tubing can be minimized This enables very compact valves with high flow rate to be used therefore helping to reduce costs CPV SC valve terminal...

Page 16: ...he control valve is marked with j 12 the work valve with Ident code J N 3 2 way valves single solenoid neutral position open K 3 2 way valves single solenoid neutral position closed D 2 2 way valves s...

Page 17: ...connection 3 5 82 84 or large scale silencer 2 Blanking plate without valve function for reserving a valve location 3 Valve sub bases with single solenoid or double solenoid valves double solenoid val...

Page 18: ...rminal you will find the following con necting display and operating elements 1 4 2 3 1 Manual override per pilot solenoid locking and non locking 2 Exhaust connections 3 5 82 84 3 Work connections 2...

Page 19: ...ollowing electrical connecting and display el ements 1 2 3 1 Multipin connection with 20 pin flat cable or 15 pin Sub D multipin connection 2 Valve location identification label 3 Yellow LED signal st...

Page 20: ...1 Summary of components 1 8 Festo P BE CPVSC EN en 0112NH...

Page 21: ...Fitting 2 1 Festo P BE CPVSC EN en 0112NH Chapter 2...

Page 22: ...2 Fitting 2 2 Festo P BE CPVSC EN en 0112NH Contents 2 Fitting 2 1 2 1 Fitting variants 2 3 2 1 1 Fitting onto a wall 2 4 2 2 Fitting the manual override cover optional 2 5...

Page 23: ...y for the valve solenoid coils You can thereby avoid uncontrolled movements of loose tubing unexpected movements of the connected actuators non defined switching states of the electronic compo nents 2...

Page 24: ...here is sufficient space for connecting the compressed air supply tubing 3 Bore 4 fastening holes with 3 2 mm diameter or threaded holes for M3 screws in the fastening surface distance between holes s...

Page 25: ...override cover optional Covers can be fitted onto the manual override to protect it against unauthorized use Proceed as follows Clip the covers into the grooves in the manual override see diagram 1 2...

Page 26: ...2 Fitting 2 6 Festo P BE CPVSC EN en 0112NH...

Page 27: ...Installation 3 1 Festo P BE CPVSC EN en 0112NH Chapter 3...

Page 28: ...ation with non lubricated compressed air 3 3 3 1 2 Operation with lubricated compressed air 3 4 3 2 General connection technology 3 6 3 3 Connecting the CPV SC valve terminal 3 8 3 3 1 Auxiliary pilot...

Page 29: ...s based on synthetic ester or true ester e g rape oil methyl ester the residual oil content must not exceed 0 1 mg m see ISO 8573 1 class 2 If mineral oils are used e g HLP oils as per DIN 51524 parts...

Page 30: ...ted com pressed air has to be used The compressed air prepared with the compressor must be of the same quality as the non lubricated compressed air If possible do not operate the complete system with...

Page 31: ...Ascertain the valve terminal which controls this cylinder 3 If applicable remove the silencer at connection 3 5 4 Hold a piece of white cardboard 10 cm in front of the ex haust bore 5 Let the system...

Page 32: ...switching states of the electronic compo nents Pay particular attention to the following The components of the valve terminal contain electrostatically sensitive elements The components will be damag...

Page 33: ...Pull locking ring 1 over the tube connection or tighten locking screw 2 3 For reasons of clarity group the tubing together with tube straps or multiple hose holders Removing 1 Loosen the locking screw...

Page 34: ...ioned remark also applies to the supply air connection 1 The CPV SC valve terminal is intended for internal or external pilot air depending on the end plates fitted Terminals for operation with extern...

Page 35: ...possible Please note that the regulated pilot air for all the valve sub bases is supplied via the left hand end plate This also applies if the CPV SC valve terminal is operated with different pressure...

Page 36: ...ocation The following types of separator plate are available Ident Code Function T Compressed air channel 1 separated S Compressed air channel 1 and exhaust channel 3 5 separated The first pressure zo...

Page 37: ...2 6 Pressure zone 3 Fig 3 3 External pilot air and separation of pressure zones Please note Make sure that pressure zones which are supplied via separator plates are sufficiently pressurized or ex hau...

Page 38: ...on the tool you are using Screw connector with hexagon socket head any se quence is possible Screw connector with external hexagon socket head connection must be made from left to right space for wren...

Page 39: ...the left hand end plate 12 14 Auxiliary pilot air M5 QS4 Screw connector in the left hand end plate 3 5 Exhausted M7 QS6 Connections in the right hand end plate for ducted exhaust air for silencers 82...

Page 40: ...1 Valve terminal 1 2 Common 3 5 3 Common 82 84 4 Valve terminal 2 5 Central 3 5 6 Central 82 84 1 2 3 4 5 2 2 6 3 Fig 3 5 Common lines with non return valves Please note The exhaust is passed through...

Page 41: ...ing they guarantee reliable isolation in accordance with EN 60950 VDE 0805 Please note By the use of PELV power units protection against electric shock protection against direct and indirect contact i...

Page 42: ...in connection Connecting the multipin cable Caution Long signal cables reduce the immunity to interference Do not exceed the maximum permitted signal cable length of 10 m Detailed information on fitti...

Page 43: ...Commissioning 4 1 Festo P BE CPVSC EN en 0112NH Chapter 4...

Page 44: ...4 Commissioning 4 2 Festo P BE CPVSC EN en 0112NH Contents 4 Commissioning 4 1 4 1 General instructions 4 3 4 2 Testing the valves 4 5 4 3 Eliminating faults 4 11...

Page 45: ...g the valve terminal under the following conditions with the safety start up valve slow build up of pressure and when there are electric signals e g after EMERGENCY STOP Apply the auxiliary pilot air...

Page 46: ...complete supply The table below shows the effects of slow start up pressuriza tion when there are electric signals External auxili ary pilot air Pressure increase in complete supply Pressure increase...

Page 47: ...allation The CPV SC valve terminal should be commissioned as fol lows Commissioning variants Activity Preliminary test of the pneu matic tubing Testing the valve cylinder com bination by means of the...

Page 48: ...fined switching states of the valves You should use the manual override especially when commis sioning the pneumatic system in order to check the function ing and operation of the valve or the valve c...

Page 49: ...of the manual override actuations to the valves is as follows 1 2 3 1 Single solenoid valves Ident Code D N K M Double solenoid valves Ident Code J 1 Manual override to pilot solenoid 14 2 Manual over...

Page 50: ...ne Testing Proceed as follows 1 Switch on the compressed air supply 2 Check the functioning and operation of each individual valve cylinder combination by actuating the manual over ride as shown in th...

Page 51: ...plunger The spring resets the plunger of the manual override to the starting position Moves back to the basic position not with 5 2 way double solenoid valve Ident Code J Caution Before commissioning...

Page 52: ...lve Moves to the switching position Leave the plunger in the lower position Remains in the switch position Then turn it 90 in an anti clockwise direction Then release the plunger Moves back to the bas...

Page 53: ...tched off Air escapes from the common line connections from the work line connections between the modules Basic position Switch position Basic position Check the seal ring or the tube fit tings After...

Page 54: ...e 3 5 82 84 Faultless Non return valves in common exhaust line Applies in the case of several systems with centrally ducted exhaust Vacuum operation low pres sure operation Separately supplied closed...

Page 55: ...PV SC valve terminal is ready for operation The LEDs are assigned to the valve locations in numerically ascending order Therefore LED 0 is assigned to valve location 0 etc The valve locations are numb...

Page 56: ...ition of the valve Meaning Yellow out Basic position Logical 0 no signal Yellow alight Switch position Logical 1 signal present Basic position Logical 1 but Operating voltage of outputs below per mitt...

Page 57: ...Maintenance and conversion 5 1 Festo P BE CPVSC EN en 0112NH Chapter 5...

Page 58: ...ntenance and conversion 5 2 Festo P BE CPVSC EN en 0112NH Contents 5 Maintenance and conversion 5 1 5 1 Cleaning replacing the large area silencer 5 3 5 2 Fitting removing components in valve location...

Page 59: ...ay you can ensure that the large area silencer functions correctly and that the valves operate correctly Proceed as follows 1 Loosen and remove the screws in the fastening frame 2 Remove the silencer...

Page 60: ...before undertaking installation and or maintenance work the compressed air supply the power supply for the valve solenoid coils You can thereby avoid uncontrolled movements of loose tubing unexpected...

Page 61: ...do not remove the tie rods 2 Pull the valve terminal apart so that there is a gap of at least 2 mm to the left and the right of the component to be replaced 3 1 2 1 Components to be replaced 2 Tie rod...

Page 62: ...Removing a component in a valve location Fitting a component Please note The valve with the work connection sub base is a unit tested for leakage by Festo Do not disconnect the screw connectors in th...

Page 63: ...correct operation of the double solenoid valve 2 If you wish to add a double solenoid valve you must re move two other components for each double solenoid valve 3 Place the component on the tie rod Pr...

Page 64: ...sion 5 8 Festo P BE CPVSC EN en 0112NH Fitting the CPV SC valve terminal Fasten the right hand wall fastening with two M3 screws of sufficient length to the wall Complete the pneumatic and electric co...

Page 65: ...Technical appendix A 1 Festo P BE CPVSC EN en 0112NH Appendix A...

Page 66: ...A Technical appendix A 2 Festo P BE CPVSC EN en 0112NH Contents A Technical appendix A 1 A 1 Accessories A 3 A 2 Technical specifications A 4 A 3 Overview of end plates A 9...

Page 67: ...QSC 4H QSC 6H CPV SC valve terminal with MP connection Ready to use multipin cable suitable for drag chain Flat band cable Plug connector for flat band cable KMP6 15 P 12 Flat cable with round conduc...

Page 68: ...C Corrosion protection as per FN 940070 KBK 1 Mounting position As desired Torques Fastening screw for wall support Tie rod Large area silencer element on the end plate 0 6 0 2 Nm 0 8 0 2 Nm 0 4 0 1 N...

Page 69: ...al Approx weight Weight Electrical sub base with MP connection End plate set with QS4 connection Per valve location 44 g 71 g 35 g Caution Operate the CPV SC valve terminal only with the media describ...

Page 70: ...nally branched from 1 With externally supplied auxiliary pilot air 1 compressed air 12 14 auxiliary pilot air 3 7 bar 6 bar 3 7 bar 0 9 7 bar 3 7 bar Manual override Locking or non locking 1 Control p...

Page 71: ...t 3 5 Auxiliary pilot air 12 14 82 84 Work air 2 4 M7 QS6 or QS1 4 M7 QS6 or QS1 4 M5 QS4 or QS5 32 M5 QS4 QS3 QS5 32 or QS1 8 Switching frequency 10 Hz Electric components Electromagnetic compatibili...

Page 72: ...A Technical appendix A 8 Festo P BE CPVSC EN en 0112NH Please note Data on the electrics of the CPV SC valve terminal with multipin connection are enclosed with the product...

Page 73: ...nds for manual override 14 or for coil 14 These are not logic designations The following valve sub bases are available for the CPV SC valve terminal Valve sub bases 12 14 14 82 84 2 1 Ident Code D Met...

Page 74: ...g reset 82 84 2 14 12 14 1 3 3 5 5 4 Ident Code M Method of operation Single solenoid 5 2 way valve pneumatic spring reset 82 84 2 14 12 14 1 3 3 5 5 4 12 Ident Code J Method of operation Double solen...

Page 75: ...Index B 1 Festo P BE CPVSC EN en 0112NH Appendix B...

Page 76: ...B Index B 2 Festo P BE CPVSC EN en 0112NH Contents B Index B 1...

Page 77: ...mmon pneumatic lines 3 14 Components Identification code 1 4 Valve sub bases A 9 Compressed air Requirements A 5 Connections Electrical CPV SC valve terminal with MP connection 1 7 Pneumatic 1 6 A 7 C...

Page 78: ...ification code 1 4 Impairment of function 4 11 Important user instructions VII L Large area silencer Cleaning replacing 5 3 LED display Valves 4 13 Low pressure operation 3 15 4 12 M Manual override 1...

Page 79: ...Overview of components 1 5 P Pictograms VIII Pneumatic operating status 4 12 Power consumption A 7 Pressure range A 6 Pressure zones 3 9 3 10 S Service V Size of connection of pneumatic screw connecto...

Page 80: ...E CPVSC EN en 0112NH T Target group V Text markings VIII Tightening torques A 4 Tubing variants 3 7 V Vacuum operation 3 15 4 12 Valve sub bases 1 4 A 9 Valve switching times A 7 Valve test 4 8 Vibrat...

Reviews: