3. Installation
3-12
Festo P.BE-CPVSC-EN en 0112NH
3.3.3 Connecting the supply and work lines
Please note
•
Seal all connections not required for the functioning of
the CPV-SC valve terminal with blanking plugs.
•
In the case of valves which are not used, seal connec-
tions 2 and 4 with blanking plugs.
•
Connect the work lines as follows, depending on the tool
you are using:
– Screw connector with hexagon socket head: any se-
quence is possible.
– Screw connector with external hexagon socket head:
connection must be made from left to right (space for
wrench).
– The double-solenoid valve (Ident. Code “J”) consists of
two components, the “control valve” and the “work
valve”. Each valve has its own housing. The control valve
is situated to the left of the “work valve” and does not
have any work connections.
Fit the screw connector or the silencers according to the table
below. Then connect the pneumatic tubing.
Summary of Contents for Smart cubic CPV-SC Series
Page 2: ......
Page 4: ...Contents and general instructions II Festo P BE CPVSC EN en 0112NH...
Page 12: ...Contents and general instructions X Festo P BE CPVSC EN en 0112NH...
Page 13: ...Summary of components 1 1 Festo P BE CPVSC EN en 0112NH Chapter 1...
Page 20: ...1 Summary of components 1 8 Festo P BE CPVSC EN en 0112NH...
Page 21: ...Fitting 2 1 Festo P BE CPVSC EN en 0112NH Chapter 2...
Page 26: ...2 Fitting 2 6 Festo P BE CPVSC EN en 0112NH...
Page 27: ...Installation 3 1 Festo P BE CPVSC EN en 0112NH Chapter 3...
Page 43: ...Commissioning 4 1 Festo P BE CPVSC EN en 0112NH Chapter 4...
Page 57: ...Maintenance and conversion 5 1 Festo P BE CPVSC EN en 0112NH Chapter 5...
Page 65: ...Technical appendix A 1 Festo P BE CPVSC EN en 0112NH Appendix A...
Page 75: ...Index B 1 Festo P BE CPVSC EN en 0112NH Appendix B...
Page 76: ...B Index B 2 Festo P BE CPVSC EN en 0112NH Contents B Index B 1...