5. Maintenance and conversion
5−11
Festo P.BE−CPASC−EN en 0808c
1
Valve position 4
(VP 4)
2
VP 5
3
VP 6
1
2 3
Fig.5/3:
Implementing pressure zones
Preliminary work:
1. Remove the pneumatic screw connector of the relevant
channel (channel (1), (3) or (5) to the right on the base
block.
2. Remove the valve sub−base after the position of which the
channel is to be separated (in the example on VP 5).
3. In order to facilitate fitting, remove also the valve sub−
base in front (in the example on VP 4).
Summary of Contents for CPA-SC Series
Page 2: ......
Page 4: ...Contents and general instructions II Festo P BE CPASC EN en 0808c...
Page 17: ...Summary of components 1 1 Festo P BE CPASC EN en 0808c Chapter 1...
Page 41: ...Fitting 2 1 Festo P BE CPASC EN en 0808c Chapter 2...
Page 55: ...Installation 3 1 Festo P BE CPASC EN en 0808c Chapter 3...
Page 85: ...Commissioning 4 1 Festo P BE CPASC EN en 0808c Chapter 4...
Page 102: ...4 Commissioning 4 18 Festo P BE CPASC EN en 0808c...
Page 103: ...Maintenance and conversion 5 1 Festo P BE CPASC EN en 0808c Chapter 5...
Page 116: ...5 Maintenance and conversion 5 14 Festo P BE CPASC EN en 0808c...
Page 117: ...Technical appendix A 1 Festo P BE CPASC EN en 0808c Appendix A...
Page 133: ...Index B 1 Festo P BE CPASC EN en 0808c Appendix B...
Page 134: ...B Index B 2 Festo P BE CPASC EN en 0808c Contents B Index B 1...