4. Commissioning
4−4
Festo P.BE−CPASC−EN en 0808c
4.1
General instructions
4.1.1
Before commissioning
·
Switch off the power supply before connecting or
disconnecting plugs (otherwise this could lead to
functional damage).
·
Commission only a valve terminal which has been fitted
and wired completely.
·
Make sure that there is a sufficient supply of fresh air
(cooling) for the following operating conditions:
when the maximum number of valves are fitted
when the maximum operating voltage is applied
when the solenoid coils are constantly under stress.
·
Please observe the following instructions on building up
pressure in the complete supply.
Summary of Contents for CPA-SC Series
Page 2: ......
Page 4: ...Contents and general instructions II Festo P BE CPASC EN en 0808c...
Page 17: ...Summary of components 1 1 Festo P BE CPASC EN en 0808c Chapter 1...
Page 41: ...Fitting 2 1 Festo P BE CPASC EN en 0808c Chapter 2...
Page 55: ...Installation 3 1 Festo P BE CPASC EN en 0808c Chapter 3...
Page 85: ...Commissioning 4 1 Festo P BE CPASC EN en 0808c Chapter 4...
Page 102: ...4 Commissioning 4 18 Festo P BE CPASC EN en 0808c...
Page 103: ...Maintenance and conversion 5 1 Festo P BE CPASC EN en 0808c Chapter 5...
Page 116: ...5 Maintenance and conversion 5 14 Festo P BE CPASC EN en 0808c...
Page 117: ...Technical appendix A 1 Festo P BE CPASC EN en 0808c Appendix A...
Page 133: ...Index B 1 Festo P BE CPASC EN en 0808c Appendix B...
Page 134: ...B Index B 2 Festo P BE CPASC EN en 0808c Contents B Index B 1...