5. Maintenance and conversion
5−5
Festo P.BE−CPASC−EN en 0808c
CPA valve termina
Connecting variants
Proceed as follows
PI connection
·
Mark the appropriate PlugIn plug for
each valve sub−base
·
Dismantle all valve sub−bases
(see section Loosening components")
·
Then push the PlugIn plugs out of the
guide in the base block
HC connection
·
Mark all connecting plugs on the valve
sub−bases
·
Press on the locking lugs of the
connecting plugs
·
Pull the plugs carefully away from the
HC connections
Tab.5/1:
Loosen the electrical connections
Loosen the pneumatic connections
Loosen the pneumatic connections as described in
section3.2.
Dismantling the CPA valve terminal
Dismantle the CPA−SC valve terminal as described in
section2.2.
Summary of Contents for CPA-SC Series
Page 2: ......
Page 4: ...Contents and general instructions II Festo P BE CPASC EN en 0808c...
Page 17: ...Summary of components 1 1 Festo P BE CPASC EN en 0808c Chapter 1...
Page 41: ...Fitting 2 1 Festo P BE CPASC EN en 0808c Chapter 2...
Page 55: ...Installation 3 1 Festo P BE CPASC EN en 0808c Chapter 3...
Page 85: ...Commissioning 4 1 Festo P BE CPASC EN en 0808c Chapter 4...
Page 102: ...4 Commissioning 4 18 Festo P BE CPASC EN en 0808c...
Page 103: ...Maintenance and conversion 5 1 Festo P BE CPASC EN en 0808c Chapter 5...
Page 116: ...5 Maintenance and conversion 5 14 Festo P BE CPASC EN en 0808c...
Page 117: ...Technical appendix A 1 Festo P BE CPASC EN en 0808c Appendix A...
Page 133: ...Index B 1 Festo P BE CPASC EN en 0808c Appendix B...
Page 134: ...B Index B 2 Festo P BE CPASC EN en 0808c Contents B Index B 1...