Maintenance, 10h
4812159501_D.pdf
2018-04-12
Removing the scapers
The scrapers can easily be removed for cleaning and
inspection.
Release the inner pin on the hook-up axle, grip the
outer pin and pull the axle straight out.
The scrapers must be hooked in the release locking
hook to avoid risking that they drop down to the
ground.
When refitting after inspection etc., the scraper must
first be hooked in the locking hook before the hook-up
axle is put in position.
Refit the inner pin and make sure that the rubber
coated wire comes over the scraper attachment.
105
Summary of Contents for CC424CHF
Page 2: ......
Page 12: ...e 4812159501_D pdf 2018 04 12...
Page 16: ...Introduction 4812159501_D pdf 2018 04 12 4...
Page 26: ...Special instructions 4812159501_D pdf 2018 04 12 14...
Page 84: ...Operation 4812159501_D pdf 2018 04 12 72...
Page 98: ...Preventive maintenance 4812159501_D pdf 2018 04 12 86...
Page 118: ...Maintenance 10h 4812159501_D pdf 2018 04 12 106...
Page 122: ...Maintenance 50h 4812159501_D pdf 2018 04 12 110...
Page 126: ...Maintenance measures 250 h 4812159501_D pdf 2018 04 12 114...
Page 144: ...Maintenance 1000h 4812159501_D pdf 2018 04 12 132...
Page 157: ......
Page 158: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com...