1.
Examine all rubber buffers 1
Fig. 213 for wear, replace if
necessary.
1.
NOTICE!
Install the support legs under pre-load.
The preload of the rubber buffers is achieved
by a gap "X"
and spacer block when tightening.
ð
Nominal value: Distance X = 1mm
If necessary attach compensation shims
on either side.
1.
NOTICE!
Bleed the travel circuit before starting opera-
tion.
Check the hydraulic oil level
Fig. 215, top up if necessary.
2.
Perform a test drive, check function of travel system, vibra-
tion and spraying system.
3.
Check all connections and fittings for leak tightness.
Fig. 213
Adjusting the pre-load of the
rubber buffers
Fig. 214
Starting up the machine
Fig. 215
Machine assemblies – Drum
BW 900-50
180
Go
to
Discount-Equipment.com
order
your
parts