1.
Turn the flywheel clockwise further
marks (2, 3) are in line.
2.
Check and , if necessary, adjust the valve clearance of the
2nd cylinder.
3.
After checking and adjusting reassemble the cylinder head
covers with new gaskets.
4.
Tighten the cylinder head screws.
After a short test run check the engine for leaks.
6.1.3.4.3 Check, adjust the idle speed
NOTICE!
We recommend to have this work carried out by
trained personnel or our after sales service.
Check and adjust only at operating temperature of
the engine.
Setting: 1400 ± 150 min
-1
1.
Run the engine to warm it up to operating temperature.
2.
Adjust the engine idling speed with the setscrew (1)
6.1.3.5
Every 2000 operating hours
6.1.3.5.1 Checking fuel lines and clamps
WARNING!
Danger of burning!
Perform inspection work only after the engine has
cooled down and with the engine stopped.
Fig. 177
Fig. 178
Machine assemblies – Engine
BW 900-50
163
Go
to
Discount-Equipment.com
to
order
your
parts