![Fayat Bomag BW 900-50 Service Manual Download Page 175](http://html1.mh-extra.com/html/fayat/bomag-bw-900-50/bomag-bw-900-50_service-manual_546858175.webp)
3.
Fig. 210 and support it safely.
4.
Unhook the springs to relieve the scrapers (1).
5.
Unscrew the fastening screws (2) and remove the vibration
motor with its flange.
6.
Fig. 211 for wear.
7.
If necessary, unscrew the hexagon nut (1) and pull off the
coupling hub (2) with a puller.
8.
Remove the feather key (3).
9.
Unscrew the fastening nuts (3)
rubber buffers.
10.
from the ports.
ENVIRONMENT!
Collect leaking oil and dispose of in an envi-
ronmentally friendly way.
11.
Disassemble the hose brackets (3).
12.
Close all hydraulic hoses and motor ports with suitable plugs.
13.
Unscrew the fastening screws (1), remove the spacer (4) and
pull the drum with the support leg sideways out of the frame.
Install the drum in reverse order, for this purpose
move the drum with attached travel motor and sup-
port leg parallel into the frame. Mount the support
leg under pretension, mount the hydraulic hoses
and vibration motor.
Fig. 210
Fig. 211
S-834-0018
1
2
3
4
Fig. 212
Installing the drum
Machine assemblies – Drum
BW 900-50
179
Go
to
Discount-Equipment.com
to
order
your
parts