![Fayat Bomag BW 900-50 Service Manual Download Page 170](http://html1.mh-extra.com/html/fayat/bomag-bw-900-50/bomag-bw-900-50_service-manual_546858170.webp)
6.
Mount bearing housing 1
Fig. 201 to bearing journal (2).
7.
housing.
8.
Insert Belleville springs 3
Fig. 203 with the curvature
pointing down.
9.
Fit the new O-ring (2) with grease into the disc (1).
10.
Install disc (1) into the bearing housing.
11.
When tightening the hexagon nut (1) move
the bearing housing to and fro to ensure a
uniform wear pattern of the individual bearing
rollers.
Cover the thread on the bearing journal with LOCTITE and
Fig. 201
Fig. 202
Fig. 203
Fig. 204
Machine assemblies – Oscillating articulated joint
BW 900-50
174
Go
to
Discount-Equipment.com
to
order
your
parts