15
Revision date: 03.21.18
115295
3
Once raft bed is prepared, continue with installation of liner. Assistants
are required to complete this installation.
1. With assistance, carefully spread liner over
assembled frame. Ensure that equal lengths
overhang ends and sides.
4. Take two (2) FA4572 Tek screws and two (2)
102921B neo-bonded washers and carefully
secure liner to top of frame.
2. Beginning at one corner, loosely and carefully
fold and press liner into corner and along
inside of base rails.
NOTE:
Ensure liner is fully seated in corners
and on bottom before installing fasteners.
These are removed later in procedure.
3. Fold liner evenly up and over top of frame rails.
Remove as many wrinkles as possible.
Do not
crease liner material.
5. Move to another corner and press liner into
place.
Required parts:
• Raft Bed Liner
• FA4572 Tek Screws, 102921B Washers, and 100442 Nut Setter
ATTENTION:
During liner installation, do not drop any tools
or sharp objects into liner bed. Doing so can puncture liner!
Exercise caution!
Verify that all debris is removed from insulation surface that
could damage or puncture liner once installed.
INSTALL RAFT BED LINER
Raft Bed Liner Installation