35
Revision date: 03.21.18
115295
Assemble Raft Bed Pump Station
8
PUMP STATION ASSEMBLY
Main pump for this system is located opposite the
mineralization tank at end of raft bed. Depending on
desired layout, pump can be situated at either corner.
See layout diagram next page for example.
Plumbing Fittings and Materials:
• 111155 Strainer
• WF3511 SxS Ball Valves (1-1/2")
(A)
• WF1384 SxSxS Tee Fitting (1-1/2") (C)
• WF1574 SxS 90° Elbow (1-1/2")
(G)
• WF6684 Sp x Slip 90° (1-1/2")
Elbow
(H)
• WF6666 SPxS Bushing (1" - 1-1/2") (K)
• 113536 Tiny Might Pump
(M)
• 113537 Union for 113536 Pump
(N)
• Use WF4140 (1-1/2" PVC pipe)
General Assembly Notes:
• Apply 113372 primer to all slip joints before applying
PVC cement.
See strainer note for exception.
• Double-check all dimensions before cutting PVC
pipe.
• All slip joints are glued except as noted.
Top view showing strainer
installed inside raft bed.
Attach directly to bulkhead.
Hand-tighten only!
111155
A
A
G
G
H
N
N
C
M
Bulkhead
Plate
Flow
K
K
*Actual main pump may differ.
Take the 111155 strainer parts and assemble
as shown. Secure cap and reducer bushing to
strainer body using PVC cement.
NOTE:
Do not apply thread sealant to threads.
Strainer is removed for routine maintenance.